Tarlac Pioneer

The Philippine's First Industrial Solar Power Plant Facility located at Pioneer Hi-Bred Philippines, Inc. San Miguel Tarlac was inaugurated today February 12, 2014.. This solar plant facilities are expected to generate approximately 194,000 kilowatt-hours of electricity in their first year, and offset approximately 193,418 kilograms of carbon dioxide emissions. The arrangement for the installation was made through a 20-year Power Purchase Agreement with Exergy Philippines (Exergy) an Engineering, Procurement and Construction project turnkey developer. Exergy is a subsidiary of Phil-Nippon Kyoei Corporation.

Project Information
Complete Address:   Luisita Industrial Park, San Miguel, Tarlac 2301
Project Description:  Solar PV Installation Project for Pioneer Hi-Bred Philippines Inc.
Capacity:                    131 kWp

Solar PV System Installation Location
Plant owner:                      Pioneer Hi-Bred Philippines Incorporated
Description of Plant:         Pioneer Cold Storage Plant 1 & 2
Installation Description:   The Solar PV System will be installed on the cold storage roof ( Pioneer Cold Storage 1 and 2)
Number of Roofs:             Two (2)
Plant Roof Area:                1260.24 sqm (one roof per plant with dimensions L=80m W = 15.753m)
Total Roof Area:                 2520.48 sqm (2 roofs, cold storage 1 and 2)
Quantity of PV module:    960
Total PV module area:      1479 sqm
Model of PV modulde:      DuPont Apollo DA142-C1

Implementation Duration
Date Started:         October 23, 2013
Date Completed:   February 8, 2014



Exergy Phils.  Corporation 2014 © All Rights Reserved

  • Home
  • Our Company
  • Our Projects
    • Tarlac Project
    • Glacier FTI
    • Carluyan
    • Glacier Liberty
    • Panay Cold Chain
  • Exergy-Labs
  • DASHBOARD
  • Media
  • Contact